A 1 MW / 2 MWh BESS project in Estonia, optimised across mFRR, aFRR and spot arbitrage, can clear roughly €200,000–€350,000 per year in gross flexibility revenue depending on market conditions. After grid fees, BSP service margin and operational costs, IRR sits in the 12–22% range. The line-by-line breakdown is below.
A real-world case study of the economics of a 1 MW / 2 MWh BESS project on the mFRR market in Estonia
What follows is the line-by-line case for a 1 MW / 2 MWh battery energy storage system (BESS) on the Estonian mFRR market — capex, monthly costs, monthly revenue, payback. Numbers are December 2025 averages.
First things first. The total investment required to build the battery is approximately €440,000. The largest share of this comes from the battery cells and inverters, estimated at €300,000. A medium-voltage transformer adds around €50,000, while installation costs, calculated at €20,000 per MWh, amount to €40,000 for a 2 MWh system. The grid connection is assumed to cost roughly €50,000, but this applies only if there is available capacity in the local network. If the connection area is already congested, reinforcing the grid can become a lengthy and expensive process, potentially making the entire project economically questionable.
In this example, the battery operates exclusively on the mFRR energy market, where participants are paid both for delivered energy and for the mFRR bids. It is assumed the battery charges and discharges only according to mFRR activations, or with imbalance energy when necessary. The battery is assumed to be activated around 50% of the time, corresponding to roughly 1,440 fifteen-minute activations per month. It is also assumed that the battery follows system operator commands with an average accuracy of ±5%, which is typical for a well-controlled BESS. Revenues and costs are based on average prices from December 2025, where Volton’s activated offers had an average UP price of 123 €/MWh and DOWN price of €3/MWh. The average day-ahead market price was 74 €/MWh, and the average imbalance energy price was 66 €/MWh.
It is further assumed that the actual energy recorded at the grid metering point represents about 60% of the energy accounted for on the regulation market, because regulation energy is based on changes in power relative to a baseline, rather than always reflecting physical energy flows into or out of the grid.
On the revenue side, the battery earns approximately €29,000 per month from mFRR activations. In addition, it earns around €20,000 per month from actually delivered energy, bringing total monthly revenue to €49,000. In rare cases, such as large frequency deviations combined with high winter electricity prices, monthly revenue can reach up to €80,000.
On the cost side, several system and network charges must be taken into account. The cost of imbalance energy paid to the balance responsible party is estimated at €4,200 per month. In addition, the Balance Responsible Party of the BESS charges a margin of €4 per delivered MWh, amounting to approximately €1,300 per month. The Elektrilevi network package fee is €800 per month, with additional charges for contracted connection capacity, €2,600, and transfer capacity, €600. Under the new net-based calculation rules, grid tariffs amount to €900 per month, while the renewable energy fee adds €1,000. Reactive energy costs are estimated at €600, the balancing capacity fee at €1,200, the security of supply fee at €1,700, and the electricity excise tax at €500.
In addition, the project must account for the fee charged by the aggregator or balancing service provider, which typically ranges from 5% to 30%, depending on the provider. Volton’s standard margin is 10%, calculated on total revenue after deducting imbalance costs. In this example, that corresponds to approximately €4,480 per month.
When all revenues and costs are combined, a clear picture emerges. Total monthly revenue is €49,000, while all fixed and variable costs — including imbalance costs, service provider fees, network charges, taxes, and the aggregator margin — sum to approximately €19,880 per month. This results in a net profit of around €29,000 per month for the battery.

On an annual basis, this monthly cash flow translates into approximately €348,000 in net profit, assuming market conditions and activation patterns remain similar to those observed in December 2025. Compared to the initial investment of roughly €440,000, the result is striking: the payback period is just under 1.5 years, on the order of 15-16 months, and the first-year return on capex is approximately 79%. (This is a one-year cash-on-cash figure, not a project-life IRR — over a typical 10-year operating horizon the IRR would be substantially higher, but also more sensitive to how mFRR pricing evolves.)
It is important to stress that this example does not rely on maximum theoretical revenues or extreme price spikes, but on Volton’s own confirmed results from December. It also excludes additional optimisation strategies and revenue streams beyond mFRR that could further increase returns in the future. These numbers help explain why battery projects in Estonia currently resemble a modern gold rush – an opportunity to generate significant cash flow in a short time with relatively compact physical infrastructure. At the same time, this remains a market- and regulation-driven business: prices, activation patterns, network fees, and market rules can and do change. Every battery project is therefore a balance between the promise of fast payback and long-term regulatory and market risk, requiring not only favourable initial conditions but also the ability to adapt over time.
If you’re sizing a battery or thinking about bidding into the frequency markets, Volton runs the BSP licence, the prequalification, and the daily bidding — we trade the asset, you keep the bulk of what the market pays.
Want to see what your asset would have earned on the Estonian market last month? Get in touch and we’ll run the numbers against December’s actual activations.
Lasīt vairāk

How Can We Reach Cheap Electricity in Estonia?
Why simply building more wind and solar is not enough — and how hybrid parks, storage and flexibility are the real path to cheap electricity in Estonia.

Electricity Markets Explained: From Spot Prices to Frequency Reserves
A plain-language guide to the key terms used in wholesale and flexibility markets — spot price, aFRR, mFRR, BRP, BSP, BESS and aggregators.

In 2026, building Battery Energy Storage in Estonia is getting even more profitable
From 2026 Estonia will calculate grid fees and renewable charges on net consumption only — a major step that can save a 100 MW BESS over €3M per year.

What is a Balance Service Provider (BSP)?
A BSP is a market participant certified by the TSO to deliver balancing services — frequency reserves like FCR, aFRR and mFRR. Here is how the role works in Europe and Estonia, and where aggregators fit in.

Inside Nord Pool
Nord Pool clears the day-ahead and intraday markets across the Nordics, Baltics, and much of Western Europe. We unpack the auction, market coupling, and what it takes to be a member.

Balance Responsible Party (BRP): who pays for every imbalanced kilowatt-hour
Every kilowatt-hour on the grid has a Balance Responsible Party that is contractually accountable for it. Here is how the BRP regime works under Elering and why aggregation matters.

REMIT Article 15 and the algorithmic-trading notification
REMIT Article 15 brings algorithmic energy trading under ACER oversight. We explain the notification regime, what counts as algorithmic, and why this matters for asset owners.

Day-ahead market: pricing an hour that has not happened yet
Every day at noon CET, an algorithm sets the price of electricity for every hour of tomorrow. The day-ahead auction is the reference the rest of the energy industry hangs off.

Intraday market — after the auction, reality drifts
After the noon auction closes, intraday opens — a continuous order book that runs until close to delivery. It is where flexibility actually pays.

Power futures: how a wind farm gets its loan approved
Forward contracts on electricity, traded on Nasdaq Commodities and EEX, let buyers fix a price for delivery months or years ahead. Most settle financially against the day-ahead spot.

PPAs — how long-term contracts financed the renewable boom
Power Purchase Agreements are 5–15 year bilateral contracts between renewable generators and corporate offtakers. They probably did more for Europe’s energy transition than any subsidy.

FCR: what catches the grid when a reactor trips
Frequency Containment Reserve activates within 30 seconds of a frequency deviation, fully automatic, no TSO signal. Batteries dominate it. It is what made grid-scale storage economically viable.

aFRR, the reserve in the middle
Automatic Frequency Restoration Reserve activates in ~30 seconds via TSO control signal, follows it on a 4-second cycle, and pulls the grid back to 50 Hz. Estonia joined the EU PICASSO platform on 9 April 2025; cross-border aFRR clears every 4 seconds across the continent.

mFRR — where Estonian battery profits come from
Manual Frequency Restoration Reserve is activated by a human operator, with full delivery in 12.5 minutes. In Estonia, it is currently the most lucrative balancing market for batteries.

Heat pumps run on dumb thermostats
A heat pump is the largest steady electrical load in winter, paired with a thermal mass that doubles as a battery. Price-aware scheduling captures spreads of 5-10x between cheap night hours and expensive mornings.

EV charging: plug in at six, leave at eight
A 50 kWh top-up costs about €15 at 02:00 or €45 at 18:00. Smart charging on OCPP-compatible wallboxes re-optimises every day against tomorrow’s spot prices, saving 50-70% on EV charging.

When your solar panels lose you money
On a sunny April afternoon, a 10 kW rooftop array can produce 8 kWh and lose money in the same hour. Smart self-consumption + curtailment + battery routing is what makes solar pay in 2025 Estonia.

Home batteries, two stacked revenue streams
A 10 kWh home battery earns ~€730/year from spot arbitrage alone. Stacked with aggregated frequency-reserve revenue (only available via a BSP), the same hardware can clear above 10% IRR.

Floor heating is the most flexible heater in your house
Resistive floor heating is in most Estonian homes and most of it runs dumb. The slab is essentially a thermal battery; price-aware scheduling captures spot-price spreads while the room temperature barely moves.

The cheapest battery in your home is the boiler
A 100-150L hot-water tank stores 4-8 kWh as heat — about the same capacity as a small home battery. A €50 smart relay on the existing tank pays itself back within the first heating season.